The Queenstown Commissioners met on October 22, 2025 (in-person and on Zoom). Public Works reported membrane delivery expected by November 7, pole lights to be erected at the boat ramp “this Friday,” town-wide hydrant flushing scheduled for 11/20 (rain date 11/21), a request from the Outlets General Manager about cleaning the water tower with a contractor quote of $24,720, and $2,800 in proposed tree work around town. Finance reported fund balances (General $364,885.62; Water/Sewer $57,373.76; ARPA $592,234.48) and commissioners approved moving $225,000 from the General Fund into a 6-month term CD; minutes for Oct. 8 and Oct. 15 were approved with noted votes and an abstention. Infrastructure updates: I&I contractor has begun dewatering; Queenstown Harbor water issues will be assessed during the town-wide flushing with valve shutoffs and flow measurements; no updates on the water tank project or federal channel dredging. Policy and development items under review include water/sewer connection code clarifications, a rate study, proposed ADU zoning amendments, Ordinance 25-06 (solar energy equipment) with a hearing set for 11/12/25, and the Wheatland’s Project agreement language sent to Richmond American and Waterman while awaiting responses; commissioners also began preliminary discussion of possible long-term rental legislation by reviewing an older Ordinance 17-05. In public comment, the town said affected residents will receive notices about Old Wharf Lane sewer work; the minutes cut off during a question from Sue Donaldson about a QVFD response.

AI-generated summary — verify against the source document.

Documents

An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.