Sign in

← All meetings

Town Commissioners — 2022-01-26

Wednesday, January 26, 2022 · source page ↗

This record is the Queenstown Town Commissioners work session and regular meeting of January 26, 2022. In the 5:00 p.m. work session Town Engineer Robert Rauch reported on infrastructure projects including an I&I (inflow & infiltration) grant application to replace about 15,000 linear feet of failing sewer lines at an estimated cost of $7.7M (the application had an error to be corrected and resubmitted), progress on new water tower and line replacement plans (about 90% complete with a revised PER to be sent to USDA), and completed designs for Old Wharf Lane drainage improvements (including consideration of a bio-swale and asking affected property owners to meet). Commissioners directed Rauch to prepare an RFP for Old Wharf Lane repairs to be funded by ARPA, reviewed expanded water/sewer code language and new connection/meter applications, and closed the work session at 6:12 p.m. In the regular meeting they approved minutes, reviewed town fund balances (General Fund $126,207.71; W/S Fund $226,224.07; ARPA Fund $342,474.29), handled public works items (ditch work on Melvin Ave., speed bump reinstalled on Charity Lane, membrane cleaning), and acted on manager items including denying a resident parking-pad request, approving a $300 reimbursement to Ryan Booth for a damaged drone, noting a $3,150 mosquito-control program with an April 18 sign-up deadline, and reporting ongoing coordination about AT&T equipment and an osprey-deterrent/platform plan; the minutes also show an incomplete line noting receipt of one proposal to buy out with no details provided.

AI-generated summary — verify against the source document.

Documents

An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.