This is a March 16, 2017 pre-budget work session of the Queenstown Commissioners to consider options for operating the town's water and wastewater facilities after the current operations contract with Miller Environmental ends. The contract with Miller automatically renewed because the town missed the 90-day nonrenewal notice, so it remains in effect through December 31, 2017. Town Engineer Robert Rauch recommended contracting with White Marsh Environmental Systems (a Tidewater Utilities subsidiary) rather than switching to town-staffed operations; White Marsh submitted a lower price and has membrane experience. The meeting noted a 2016 missed nitrate test by Miller that produced an MDE violation (possible fine unknown), a pending GMB report on a polymer issue (Ovivo may replace membranes if found at fault), and planned funding discussions with USDA and inquiry into the MDE State Revolving Fund for a project (new tower, well, treatment facility, and some water line replacements) expected to take about one year. Commissioners scheduled a closed-session meeting with White Marsh representatives for March 22 and adjourned by unanimous 3-0 vote.

AI-generated summary — verify against the source document.
Show the raw extracted text

Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.

QUEENSTOWI\I COMMISSIONERS
PRE.BUDGET WORI( SESSION
March 16,2017
PRESENT: President Thomas B. Willis, Jr., Commissioner George L. Plumbo, Jr., and
Commissioner Hogie Schuster. Also present, Acting Town Manager Mike Bowell, Town
Engineer Robert Rauch, and Lane Cole, Public Works.
MEETING CALLED TO ORDER AT 1.1:20 A.M.
Purpose of this work session was to consider alternatives for operation of our water and
wastewater facilities following the expiration of our current operations contract with Miller
Environmental at the end of December 2017.
Mr. Rauch advised that there had been conversations and investigations for alternatives for
contract services and town staffed operations. He had solicited prices on operations when the
new plant was built and was to be put online. There had been a few prices submitted, and
doesn't feel any additional solicitation is needed. Our conftact with Miller automatically
renewed as we missed the 90 day notice requirement that we would not renew our confiact, and
are thereby obligated to its terms until December 31, 2017.
White Marsh Environmental Systons, lrc., a subsidiary of Tidewater Utilities, is very
experienced. They have excellent experience with mernbranes. They also submitted a price
much less than Miller.
Mr. Rauch's recommendation is that the town is not ready for a town staffed facility. It is costly
and there is not enough support. He strongly recoillmends going with Marsh at the end of our
existing contract with Miller.
Mr. Bowell stated that Miller Environmental missed a Nitrate test in 2016, which caused the
Town to have a violation with MDE. He is not sure at this time whether the town will be fined
for this violation. Mr. Rauch doesn't think we will.
Mr. Rauch informed that he hopes to have the report from GMB on the polymer issue at the plant
soon. He stated it looks like the problem will come back on Ovivo. Ovivo has indicated they
will replace membrane if it is found to be their fault.
The Commissioners would like to meet with Marsh representatives in a closed session on March
22"d at6:00 p.m. to discuss contract issues.
Mr. Rauch reported that he is meeting with USDA next week regarding funding for new tower,
well, treatment facility, and replacement of some water lines. He is also looking into the MDE
State Revolving Fund to see if any grants are available for that project. The project would take
approximately one year from design to completion.

There being no further business to discuss, President Willis motioned to adjoum the meeting at
12:02 p.m. Motion seconded by Commissioner Plumbo. Vote: 3-aye,0-nay.
Respectfu lly submitted,
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.