This May 18, 2018 work session records that Town Engineer Robert Rauch recommended immediate repairs to a section of the sewer collection system after limited video inspection and town staff observations identified a consistent high base flow serving homes on Del Rhodes Avenue; the Del Rhodes Avenue pumping station is also a suspected source of inflow. Commissioners voted to grout the sewer lines as recommended and to continue investigating sources of inflow, with agreement that the entire town could be inspected if needed. Clerk/Treasurer Amy Moore and Finance Chair Patricia Bowell presented a first draft general fund budget with no proposed tax rate increases, and the Commissioners approved David Sears’s proposal to remove and install new sidewalks on Maryland Avenue and Steamboat Avenue for $8,211 (concrete quoted as 18 yds at $150/yd); the meeting adjourned at 4:13 p.m.

AI-generated summary — verify against the source document.
Show the raw extracted text

Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.

QUEENSTOWN COMMISSIONERS
WORK SESSION
May 18, 2018
PRESENT: President Tom Willis, Commissioner Al Hardee, Patricia Bowell, Finance Chair,
and Amy Moore.
WORK SESSION CALLED TO ORDER AT 2:00 P.M.
President Willis called the work session to order.
Town Engineer, Robert Rauch, provided the Clerk with a memo to the Commissioners with his
recommendation to initiate repairs to a section ofthe collection system. The Town has been
experiencing high flows. The Town has completed a limited amount ofvideo inspection based
on the experience oftown staffresponsible for the maintenance ofthe collection system.
Instincts were proven to be reliable based on the observation ofa consistent high base flow in a
section ofthe system that provides service to a limited number ofhomes on Del Rhodes Ave.
This infiltration source is significant enough to warrant immediate repair. This source is not the
complete problem but significant enough to be addressed. This section ofthe collection system
drains to the Del Rhodes Avenue pumping station, which is also a suspected source ofinflow.
President Willis motioned to grout the sewer lines as recommended by Bob Rauch, as well as
continue to investigate the source ofthe inflow. Motion seconded by Commissioner Hardee.
Vote: 2-aye, 0-nay
Commissioners were in agreement that the entire town should be inspected ifneed be to
determine the problems.
Amy Moore, Clerk/Treasurer and Patricia Bowell, Finance Chair, presented a first draft ofthe
general fund budget. Several issues were reviewed and discussed. There are no increases in tax
rates proposed.
Prices received from David Sears for labor to remove and install new sidewalks on Maryland
Avenue and Steamboat Avenue in the amount of$8,211 ifit can be done now. Concrete quoted
at 18 yds at $150 yd. for all three sections.
President Willis motioned to accept Mr. Sears’s proposal and have the work done now. Motion
seconded by CommissionerHardee. Vote: 2-aye, 0-nay
There being no further business at this time, President Willis motioned to adjourn the meeting at
4:13 p.m. Motion seconded by CommissionerHardee. Vote: 2-aye, 0-nay
Respectfully submitted,
Town Clerk/Treasurer
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.