This document is Queen Anne’s County’s Fiscal Year 2014 approved budgets and capital plan. The General Fund for FY2014 is approved at $113,924,180, a 5.5% increase from FY2013, with the General County Government subtotal at $32,207,734 and Other Agencies at $64,365,546; notable changes include Legal Services (+22.0%), Information, Comm. & Technology (+33.0%), Animal Services (−67.8%), the Sheriff’s Office (+11.4%), and Board of Education funding increased to $46,730,398 (+6.8%). An Economic Development Incentive Fund shows $350,000 in recordation tax revenue and $350,000 in other charges for FY2014. The Sanitary District Enterprise Fund is balanced at $9,332,208 with detailed revenue and expense lines (split between two water funds and operations such as collection, treatment, distribution). The FY2014 capital budget lists specific projects and allocations, including a $6,000,000 County Complex (bond and other funds), a $3,200,000 radio system upgrade (bond), $1,000,000 for a new circuit courthouse, $380,000 to volunteer fire departments, and $350,000 for economic development projects.

AI-generated summary — verify against the source document.
Show the raw extracted text

Exactly as extracted, unformatted — for checking against the original. The readable version is easier to read.

QUEEN ANNE’S COUNTY, MARYLAND
APPROPRIATION BUDGET – GENERAL FUND
FISCAL YEAR 2014
FY14 $ %
FY12 Act FY13 Bud Approved Change Change
County Administration
Commissioners' Office 348,132 353,464 356,747 3,283 0.9%
County Administrator's Office 274,485 256,989 263,986 6,997 2.7%
Legal Services 389,889 321,895 392,622 70,727 22.0%
Budget & Finance 9 77,960 1,036,005 998,141 (37,864) ‐3.7%
Miscellaneous Transfers Out 150,868 248,471 253,846 5,375 2.2%
Human Resources 447,844 467,813 474,915 7,102 1.5%
Economic Development & Tourism 4 58,823 398,584 331,375 (67,209) ‐16.9%
Information, Comm. & Technology 4 55,450 522,181 694,668 172,487 33.0%
QAC‐TV 2 49,993 233,842 240,103 6,261 2.7%
TOTAL 3,753,443 3,839,244 4,006,403 167,159 4.4%
Community Services
Area Agency on Aging 1,147,168 1,104,304 1,222,770 118,466 10.7%
Housing & Community Services 289,100 441,308 452,923 11,615 2.6%
Housing Authority 31,198 ‐ ‐ ‐ 0.0%
Local Management Board 147,265 153,392 161,266 7,874 5.1%
Recreation 276,183 536,818 493,435 (43,383) ‐8.1%
TOTAL 1,890,914 2,235,822 2,330,394 94,572 4.2%
Planning & Zoning 1,780,681 1,805,521 1,804,239 (1,282) ‐0.1%
Public Safety
Animal Services 726,662 693,662 223,411 (470,251) ‐67.8%
Detention Center 3,962,390 4,308,527 4,344,256 35,729 0.8%
Emergency Services 6,956,550 7,069,204 6,971,903 (97,301) ‐1.4%
TOTAL 1 1,645,602 12,071,393 11,539,569 (531,824) ‐4.4%
Public Works
Administration & Engineering 8 04,901 837,105 931,501 94,396 11.3%
General Services 2,038,429 2,005,991 2,110,152 104,161 5.2%
Landings & Marinas ‐ 40,599 ‐ (40,599) ‐100.0%
Parks 1,659,006 2,345,704 2,572,356 226,652 9.7%
Roads 1,854,363 4,884,726 5,133,324 248,598 5.1%
Solid Waste 1,584,686 1,711,237 1,666,900 (44,337) ‐2.6%
Weed Control 95,772 112,103 112,896 793 0.7%
TOTAL 8,037,155 11,937,465 12,527,128 589,663 4.9%
SUBTOTAL GENERAL COUNTY GOVT: 27,107,795 31,889,445 32,207,734 318,289 1.0%
Other Agencies
State's Attorney's Office 1,009,923 1,042,490 1,061,996 19,506 1.9%
4‐H Park 64,580 67,878 67,878 ‐ 0.0%
Sheriff's Office 6,089,371 5,866,502 6,537,240 670,738 11.4%
Orphans' Court 75,030 66,314 76,163 9,849 14.9%
Circuit Court 4 07,038 451,068 519,910 68,842 15.3%
Fire Protection & Rescue 2,838,149 2,958,724 3,120,559 161,835 5.5%
Board of Education 4 3,528,032 43,754,524 46,730,398 2,975,874 6.8%
Chesapeake College 1,698,492 1,667,522 1,667,522 ‐ 0.0%
QAC Free Library 1,277,993 1,278,293 1,310,250 31,957 2.5%
Board of Elections 4 26,044 445,182 453,880 8,698 2.0%
Public Health 1,604,462 1,799,587 2,069,587 270,000 15.0%
Social Services 253,853 280,811 299,017 18,206 6.5%
Soil Conservation Service 125,493 134,733 194,219 59,486 44.2%
UMD Extension Service 243,235 255,624 256,927 1,303 0.5%
TOTAL 5 9,641,693 60,069,252 64,365,546 4,296,294 7.2%
Debt
Board of Education 8,359,585 7,982,356 8,029,300 46,944 0.6%
General County Government 2,763,004 2,609,153 2,659,040 49,887 1.9%
TOTAL 1 1,122,589 10,591,509 10,688,340 96,831 0.9%
Other
Intergovernmental 594,777 728,686 435,955 (292,731) ‐40.2%
General Insurance 3 83,137 447,000 441,000 (6,000) ‐1.3%
Retiree Benefits/OPEB 2,625,781 2,497,236 3,036,682 539,446 21.6%
Local Grants 29,351 43,525 43,525 ‐ 0.0%
Capital Projects & Other Transfer 5,076,962 1,906,546 586,147 (1,320,399) ‐69.3%
Teacher Pensions ‐ 1,105,527 1,401,286 295,759 26.8%
Non‐Departmental ‐ ‐ 337,282 337,282 100.0%
Reversion/Benefits/Salary Savings ‐ (1,460,000) (400,000) 1,060,000 ‐72.6%
Contingency 71,655 150,782 780,685 629,903 417.8%
TOTAL 8,781,664 5,419,302 6,662,562 1,243,260 22.9%
TOTAL GENERAL FUND: 106,653,738 107,969,509 113,924,180 5,954,671 5.5%
6

QUEEN ANNE'S COUNTY
ECONOMIC DEVELOPMENT INCENTIVE FUND
FISCAL 2014 APPROVED BUDGET
FY12 FY13 FY14
PRIOR CURRENT APPROVED
ACTUAL BUDGET BUDGET
REVENUE
RECORDATION TAX ‐ ‐ 350,000
INTEREST ‐ ‐ ‐
CONTRIBUTION TO FUND BALANCE ‐ ‐ ‐
TOTAL REVENUE ‐ ‐ 350,000
EXPENDITURES
SALARIES & WAGES ‐ ‐ ‐
CONTRACTED SERVICES ‐ ‐ ‐
SUPPLIES & MATERIALS ‐ ‐ ‐
PAYROLL EXPENSE ‐ ‐ ‐
OTHER CHARGES ‐ ‐ 350,000
CAPITAL OUTLAY ‐ ‐ ‐
TOTAL EXPENDITURES ‐ ‐ 350,000
NET INCOME/(LOSS) ‐ ‐ ‐
16

QUEEN ANNE'S COUNTY
SANITARY DISTRICT ENTERPRISE FUND
FISCAL 2014 APPROVED BUDGET
KNS&G KNS&G TOTAL
WWATER WATER O&M
USER REVENUES 4,719,108 2,288,760 7,007,868
INSPECTION FEES 2 5,000 ‐ 25,000
INTEREST 2 0,000 10,000 30,000
USER INTEREST 8 0,000 ‐ 80,000
INTERFUND TRANSFER IN ‐ 83,109 ‐
TRANSFER IN (DEBT SERVICE FUND) 1,355,099 1 95,632 1,633,840
DEVELOPER REVIEW & EXACTIONS 1,000 ‐ 1,000
OTHER REVENUES 354,500 200,000 554,500
TOTAL REVENUE 6,554,707 2,777,501 9,332,208
ADMINISTRATION & INSPECTION
SALARIES & WAGES 298,628 2 72,718 571,346
CONTRACTED SERVICES 96,000 68,500 164,500
SUPPLIES & MATERIALS 55,000 57,000 112,000
PAYROLL EXPENSE 1 23,210 1 19,760 242,970
OTHER CHARGES 1,470,249 3 84,295 1,854,544
CAPITAL OUTLAY ‐ 5,000 5,000
TOTAL 2,043,087 9 07,273 2,950,360
COLLECTION
SALARIES & WAGES 988,866 ‐ 988,866
CONTRACTED SERVICES 1 74,000 ‐ 174,000
SUPPLIES & MATERIALS 3 07,000 ‐ 307,000
PAYROLL EXPENSE 4 46,406 ‐ 446,406
OTHER CHARGES 3 00,000 ‐ 300,000
CAPITAL OUTLAY 8 68,769 ‐ 868,769
TOTAL 3,085,041 ‐ 3,085,041
DISTRIBUTION
SALARIES & WAGES ‐ 84,024 84,024
CONTRACTED SERVICES ‐ 90,000 90,000
SUPPLIES & MATERIALS ‐ 31,000 31,000
PAYROLL EXPENSE ‐ 47,625 47,625
TOTAL ‐ 2 52,649 252,649
TREATMENT
SALARIES & WAGES 325,045 4 28,958 754,003
CONTRACTED SERVICES 1 99,500 2 00,000 399,500
SUPPLIES & MATERIALS 2 14,500 2 39,750 454,250
PAYROLL EXPENSE 1 44,534 2 19,933 364,467
OTHER CHARGES 3 68,500 1 77,000 545,500
CAPITAL OUTLAY ‐ 2 36,438 236,438
TOTAL 1,252,079 1,502,079 2,754,158
SHOP
CONTRACTED SERVICES 1 05,000 60,000 165,000
SUPPLIES & MATERIALS 69,500 55,500 125,000
TOTAL 1 74,500 1 15,500 290,000
TOTAL EXPENSES 6,554,707 2,777,501 9,332,208
SURPLUS (DEFICIT) ‐ ‐ ‐
17

QUEEN ANNE'S COUNTY
CAPITAL BUDGET BY YEAR
FY 2014
OPERATING CAPITAL
DESCRIPTION PAYGO GRANTS BONDS FUNDS FUND BAL OTHER TOTAL
ALLOCATION TO VOLUNTEER FIRE DEPARTMENTS - - - - 380,000 - 380,000
4-H PARK IMPROVEMENTS (QAC Park Board) - - - - 120,000 - 120,000
ECONOMIC DEVELOPMENT PROJECTS - - - - - 350,000 350,000
LONG MARSH DITCH - EROSION & STABILIZATION - - - - - 25,000 2 5,000
BEAVERDAM TAX DITCH - - - - - 20,000 2 0,000
TRANSFER TO HOUSING & COMMUNITY SERVICES CWF - - - - - 100,000 100,000
TOTAL OUTSIDE AGENCIES AND OTHER - - - - 5 00,000 495,000 995,000
LIGHTING UPGRADES - COUNTY BUILDINGS - - - - 100,000 - 100,000
NEW CIRCUIT COURTHOUSE - - - - - 1,000,000 1,000,000
CAPITAL EQUIPMENT - LIGHT VEHICLES - - - - 100,000 - 100,000
COUNTY COMPLEX - - 5,000,000 - - 1,000,000 6,000,000
PUBLIC DRAINAGE & STORMWATER MGMT - 175,000 - - - 25,000 200,000
COUNTY FACILITIES PROGRAM - - - - 200,000 - 200,000
EASEMENTS-FRIZZ KING - - - - - 33,872 33,872
TOTAL ADMINISTRATION & GENERAL SERVICES - 175,000 5,000,000 - 400,000 2,058,872 7,633,872
AUTOMATION, UPDATES & GASB IMPLEMENTATIONS 15,000 - - - - 15,000 30,000
TOTAL HR & FINANCE 15,000 - - - - 15,000 30,000
SHERIFF CARS - REPLACEMENT - - 276,380 - - - 276,380
TOTAL SHERIFF - - 276,380 - - - 276,380
EMS QUICK RESPONSE SUPERVISOR VEHICLE - - - - 57,779 - 57,779
EM RESPONSE VEHICLE - - - - 73,890 - 73,890
EMS-PHASE IV - STA NORTH COUNTY - - - - - 375,000 375,000
ADMIN RESPONSE VEHICLE 111,356 - - - - - 111,356
EMS-LIFEPAK 12 GRANT/UPGRADE 15,791 15,791 - - - - 31,582
HARDWARE REPLACEMENT 30,000 - - - - - 30,000
COMM - WIRELESS NETWORK - - - - 70,000 - 70,000
RADIO SYSTEM UPGRADE - - 3,200,000 - - - 3,200,000
TOTAL DEPARTMENT OF EMERGENCY SERVICES 157,147 15,791 3,200,000 - 201,669 375,000 3,949,607
VEHICLES-TRANSPORT / STAFF - - - - 52,000 - 52,000
TOTAL DETENTION CENTER - - - - 52,000 - 52,000
GIS AND CURRENT PLANNING INITIATIVES - - - - 37,500 - 37,500
COUNTY WIDE ORTHO/PLANIMETRIC MAPPING - - - - 25,000 30,000 5 5,000
WATERSHED IMPROVEMENT PROGRAM (WIP) - - - - 1 50,000 - 150,000
TOTAL PLANNING & ZONING - - - - 2 12,500 30,000 242,500
IT INFRASTRUCTURE - - - 400,000 - 400,000
FIBER INFRASTRUCTURE - - 350,000 - - - 350,000
TOTAL IT - - 350,000 - 400,000 - 750,000
CAPITAL EQUIPMENT - LIGHT VEHICLES - - - - 50,000 - 50,000
TOTAL ANIMAL CONTROL - - - - 50,000 - 50,000
TRANSFER STATION- IMPROVEMENTS - - - - 50,000 - 50,000
CAPITAL EQUIPMENT - LIGHT VEHICLES - - - - - 35,000 3 5,000
CAPITAL EQUIPMENT - HEAVY & CONSTRUCTION VEHICLES - - - - - 100,000 100,000
CAPITAL EQUIPMENT - MISC SMALL & NON-MOTORIZED 84,000 - - - - - 84,000
TOTAL SOLID WASTE 84,000 - - - 50,000 135,000 269,000
RELOCATABLE CLASSROOMS 80,000 - - - - - 80,000
SECURITY UPGRADES - - - - 220,000 - 220,000
TEXTBOOKS - - - - - 200,000 200,000
TECHNOLOGY - COMPUTER EQUIP - - - - - 200,000 200,000
EQUIP & VEHICLES - - - - - 100,000 100,000
STEVENSVILLE MIDDLE - RENOVATIONS - - 11,400,000 - - - 11,400,000
TOTAL BOARD OF EDUCATION 80,000 - 11,400,000 - 2 20,000 500,000 12,200,000
ALLIED HEALTH & ATHLETICS CONSTRUCTION - - 8,001,551 - - - 8,001,551
TOTAL CHESAPEAKE COLLEGE - - 8,001,551 - - - 8,001,551
CAPITAL EQUIPMENT (GEN FUND) - - - 150,000 - 150,000
MAJOR MAINTENANCE FUND - - - 150,000 - 150,000
CHURCH HILL PARK BERMUDA GRASS AND IRRIGATION PROJ - - - - 60,000 - 60,000
RT 18 BALLFIELD LIGHTS - - - - 2 40,000 - 240,000
TOTAL PARKS - - - - 600,000 - 600,000
TOTAL GENERAL CAPITAL PROJECTS 336,147 190,791 28,227,931 - 2,686,169 3,608,872 35,049,910
18

QUEEN ANNE'S COUNTY
CAPITAL BUDGET BY YEAR
FY 2014
OPERATING CAPITAL
DESCRIPTION PAYGO GRANTS BONDS FUNDS FUND BAL OTHER TOTAL
CAPITAL EQUIPMENT - LANDINGS - - - 10,000 - - 10,000
CRUMPTON BULKHEAD - 50,000 - 50,000 - - 100,000
TOTAL PUBLIC LANDINGS ENTERPRISE - 50,000 - 60,000 - - 110,000
BLUE HERON GOLF COURSE - IRRIGATION - - - - 270,000 - 270,000
BLUE HERON DRIVING RANGE - 25,000 - 25,000 - - 50,000
TOTAL GOLF COURSE ENTERPRISE - 25,000 - 25,000 2 70,000 - 320,000
RELOCATE PIER ONE ROAD - - 1,000,000 - - - 1,000,000
ADDITIONAL HANGERS - - 750,000 - - - 750,000
CONSTRUCT APRON PHASE II - 1,950,000 50,000 - - - 2,000,000
TOTAL BAY BRIDGE AIRPORT ENTERPRISE - 1,950,000 1,800,000 - - - 3,750,000
HOUSING REHABILITATION LOANS - - - - - 50,000 5 0,000
QACCA OUR HAVEN SHELTER - 1,450,958 - - - - 1,450,958
TOTAL HOUSING AND COMMUNITY SERVICES - 1,450,958 - - - 50,000 1,500,958
CAPITAL EQUIPMENT - LIGHT VEHICLES - - - - 210,000 - 210,000
CAPITAL EQUIPMENT - HEAVY & CONSTRUCTION VEHICLES - - - - 80,000 - 80,000
CAPITAL EQUIPMENT - MISC SMALL & NON-MOTORIZED EQUIP - - - - 60,000 - 60,000
ASPHALT OVERLAYS 250,000 - - - - - 250,000
TOTAL ROADS BOARD CAPITAL PROJECTS 250,000 - - - 350,000 - 600,000
VACUUM PUMP REPLACEMENTS - - - 60,000 - - 60,000
PICKUP TRUCK - REPLACEMENT - - - 125,000 - - 125,000
CONSTRUCTION EQUIPMENT-SEWER - - - 100,000 - - 100,000
COUNTY WIDE ORTHO/PLANIMETRIC MAPPING - - - 15,000 - - 15,000
RT18 & RT552 FORCE MAIN REPLACE - PH I - - - 290,000 - - 290,000
GENERATOR REPLACEMENTS - - - 288,769 - - 288,769
TOTAL SEWER ENTERPRISE - - - 878,769 - - 878,769
COUNTY WIDE ORTHO/PLANIMETRIC MAPPING - - - 15,000 - - 15,000
MISCELLANEOUS SMALL EQUIPMENT-WATER - - - 17,500 - - 17,500
PICKUP TRUCK FLEET - REPLACEMENT - - - 55,000 - - 55,000
GAS DISINFECTION ELIMINATION PROJECT - - - 30,000 - - 30,000
WATER - GENERATORS - - - 118,938 - - 118,938
TOTAL WATER ENTERPRISE - - - 236,438 - - 236,438
TOTAL ALL CAPITAL PROJECTS 586,147 3,666,749 30,027,931 1,200,207 3,306,169 3,658,872 42,446,075
19

QUEEN ANNE'S COUNTY
CAPITAL BUDGET SUMMARY BY EXPENDITURE
FY 2014-2019
DESCRIPTION FY14 FY15 FY16 FY17 FY18 FY19 TOTAL
ALLOCATION TO VOLUNTEER FIRE DEPARTMENTS 380,000 380,000 380,000 380,000 380,000 380,000 2 ,280,000
4-H PARK IMPROVEMENTS (QAC Park Board) 120,000 5 0,000 5 0,000 85,000 5 5,000 - 360,000
ECONOMIC DEVELOPMENT PROJECTS 350,000 - - - - - 350,000
LONG MARSH DITCH - EROSION & STABILIZATION 25,000 - - - - - 25,000
BEAVERDAM TAX DITCH 2 0,000 - - - - - 20,000
TRANSFER TO HOUSING & COMMUNITY SERVICES CWF 100,000 100,000 100,000 100,000 100,000 100,000 600,000
TOTAL OUTSIDE AGENCIES AND OTHER 995,000 530,000 530,000 565,000 535,000 480,000 3 ,635,000
LIGHTING UPGRADES - COUNTY BUILDINGS 100,000 100,000 - - - - 200,000
NEW CIRCUIT COURTHOUSE 1,000,000 3,000,000 11,000,000 - - - 15,000,000
CAPITAL EQUIPMENT - LIGHT VEHICLES 100,000 2 5,000 2 5,000 25,000 2 5,000 25,000 225,000
COUNTY COMPLEX 6,000,000 - - - - - 6,000,000
YMCA - 9,400,000 - - - - 9,400,000
PUBLIC DRAINAGE & STORMWATER MGMT 200,000 200,000 200,000 - - - 600,000
COUNTY FACILITIES PROGRAM 200,000 200,000 200,000 200,000 200,000 200,000 1 ,200,000
EASEMENTS-FRIZZ KING 3 3,872 - - - - - 33,872
TOTAL ADMINISTRATION & GENERAL SERVICES 7,633,872 12,925,000 11,425,000 225,000 225,000 225,000 32,658,872
AUTOMATION, UPDATES & GASB IMPLEMENTATIONS 3 0,000 20,000 10,000 10,000 10,000 10,000 90,000
BENEFITS & COMPENSATION STUDIES - - - - - - -
TOTAL HR & FINANCE 3 0,000 2 0,000 1 0,000 10,000 1 0,000 10,000 90,000
SHERIFF CARS - REPLACEMENT 276,380 256,530 256,530 256,530 256,530 256,530 1,559,030
- - - - - - -
TOTAL SHERIFF 276,380 256,530 256,530 256,530 256,530 256,530 1 ,559,030
EMS QUICK RESPONSE SUPERVISOR VEHICLE 5 7,779 5 7,779 - - 108,856 72,335 296,749
EMS-TYPE I MODULAR AMBULANCE - NEW - 219,905 226,502 233,297 240,295 247,503 1 ,167,502
EM RESPONSE VEHICLE 7 3,890 - - - - - 73,890
EMS-PHASE IV - STA NORTH COUNTY 375,000 - - - - - 375,000
DES FACILITY RENOVATIONS & ADDITION - 4,200,000 - - - - 4,200,000
ADMIN RESPONSE VEHICLE 111,356 167,034 - - - 55,678 334,068
EMS-LIFEPAK 12 GRANT/UPGRADE 3 1,582 3 1,582 3 1,582 31,582 3 1,582 31,582 189,492
HARDWARE REPLACEMENT 3 0,000 3 0,000 4 0,000 40,000 100,000 35,000 275,000
COMM - WIRELESS NETWORK 7 0,000 8 0,000 9 0,000 100,000 110,000 120,000 570,000
RADIO SYSTEM UPGRADE 3,200,000 3,000,000 3,790,000 40,000 50,000 100,000 10,180,000
TOTAL DEPARTMENT OF EMERGENCY SERVICES 3,949,607 7,786,300 4,178,084 444,879 640,733 662,098 17,661,701
CONTROL PANEL - 50,000 - - - - 50,000
VEHICLES-TRANSPORT / STAFF 5 2,000 30,000 26,000 - - - 108,000
TOTAL DETENTION CENTER 5 2,000 80,000 2 6,000 - - - 158,000
CAPITAL EQUIPMENT - LIGHT VEHICLES - 26,000 2 6,000 26,000 - - 78,000
STRATEGIC PLANNING INITIATIVES-COMM PLANNING - 25,000 3 7,500 37,500 3 7,500 37,500 175,000
GIS AND CURRENT PLANNING INITIATIVES 37,500 3 7,500 3 7,500 37,500 3 7,500 37,500 225,000
COUNTY WIDE ORTHO/PLANIMETRIC MAPPING 5 5,000 5 5,000 5 5,000 55,000 5 5,000 55,000 330,000
WATERSHED IMPROVEMENT PROGRAM (WIP) 150,000 150,000 150,000 150,000 150,000 150,000 900,000
COMMUNITY PLAN & COMPREHENSIVE PLAN UPDATE - 100,000 100,000 300,000 100,000 100,000 700,000
TOTAL PLANNING & ZONING 242,500 393,500 406,000 606,000 380,000 380,000 2 ,408,000
IT INFRASTRUCTURE 400,000 200,000 100,000 100,000 100,000 100,000 1 ,000,000
FIBER INFRASTRUCTURE 350,000 550,000 550,000 550,000 550,000 - 2,550,000
RECORDS MANAGEMENT SYSTEM - - - - - - -
TOTAL IT 750,000 750,000 650,000 650,000 650,000 100,000 3 ,550,000
CAPITAL EQUIPMENT - LIGHT VEHICLES 5 0,000 25,000 25,000 - - - 100,000
TOTAL ANIMAL CONTROL 5 0,000 25,000 2 5,000 - - - 100,000
TRANSFER STATION- IMPROVEMENTS 5 0,000 5 0,000 5 0,000 50,000 5 0,000 50,000 300,000
CAPITAL EQUIPMENT - LIGHT VEHICLES 3 5,000 - 100,000 - 50,000 35,000 220,000
CAPITAL EQUIPMENT - HEAVY & CONSTRUCTION VEHICLES 100,000 280,000 180,000 130,000 150,000 - 840,000
CAPITAL EQUIPMENT - MISC SMALL & NON-MOTORIZED 84,000 84,000 84,000 24,000 84,000 24,000 384,000
TOTAL SOLID WASTE 269,000 414,000 414,000 204,000 334,000 109,000 1 ,744,000
KENT ISLAND EXPANSION - 1,415,000 1,165,000 - - - 2,580,000
TOTAL PUBLIC LIBRARY SYSTEM - 1,415,000 1,165,000 - - - 2,580,000
TRANSIT VEHICLE - LARGE - - 310,000 310,000 - - 620,000
CAPITAL EQUIPMENT - LIGHT VEHICLES - - 40,000 40,000 - - 80,000
TOTAL AGING - - 350,000 350,000 - - 700,000
RELOCATABLE CLASSROOMS 8 0,000 175,000 175,000 175,000 175,000 175,000 955,000
SECURITY UPGRADES 220,000 - - - - - 220,000
BAYSIDE ELEM REN PK-K - - - 42,000 465,000 - 507,000
TEXTBOOKS 200,000 - - - - - 200,000
TECHNOLOGY - COMPUTER EQUIP 200,000 - - - - - 200,000
EQUIP & VEHICLES 100,000 - - - - - 100,000
STEVENSVILLE MIDDLE - RENOVATIONS 11,400,000 - - - - - 11,400,000
NEW HIGH SCHOOL - 2,000,000 20,118,000 - 2,000,000 - 24,118,000
NEW ELEMENTARY - SOUTH COUNTY - - - - 8,455,000 - 8,455,000
TOTAL BOARD OF EDUCATION 12,200,000 2,175,000 20,293,000 217,000 11,095,000 175,000 46,155,000
20

QUEEN ANNE'S COUNTY
CAPITAL BUDGET SUMMARY BY EXPENDITURE, continued
FY 2014-2019
DESCRIPTION FY14 FY15 FY16 FY17 FY18 FY19 TOTAL
ALLIED HEALTH & ATHLETICS CONSTRUCTION 8,001,551 - - - - - 8,001,551
ALLIED HEALTH & ATHLETICS FF&E - 150,500 - - - - 150,500
QUEEN ANNE'S TECHNICAL BUILDING - DESIGN - - 41,186 - - - 41,186
QUEEN ANNE'S TECHNICAL BUILDING - CONSTRUCTION - - - 588,377 - - 588,377
QUEEN ANNE'S TECHNICAL BUILDING - FF&E - - - - 28,417 - 28,417
CAMBRIDGE CENTER - DESIGN - - - - - 97,335 97,335
TOTAL CHESAPEAKE COLLEGE 8,001,551 150,500 4 1,186 588,377 2 8,417 97,335 8,907,366
CAPITAL EQUIPMENT (GEN FUND) 150,000 150,000 150,000 150,000 150,000 150,000 900,000
MAJOR MAINTENANCE FUND 150,000 150,000 150,000 150,000 150,000 150,000 900,000
GRASONVILLE PARK - TENNIS COURTS - 80,000 - - - - 80,000
ADA COMPLIANCE - 200,000 200,000 200,000 200,000 200,000 1 ,000,000
KUDNER TRAIL/PARKING LOT & BALL FIELDS - 30,000 - - - - 30,000
CHRIST CHURCH - REPLACE STAINED GLASS - 65,000 - - - - 65,000
CHURCH HILL PARK BERMUDA GRASS AND IRRIGATION PROJ 6 0,000 - - - - - 60,000
CHURCH HILL PARK PARKING LOT LIGHTS - 100,000 - - - - 100,000
RT 18 BALLFIELD LIGHTS 240,000 - - - - 350,000 590,000
KIST SPUR (TOWER GARDENS) - - 70,000 - - - 70,000
KIST SPUR (TWIN COVE ESTATES) - - - 70,000 - - 70,000
KIST PHASE II - - - 50,000 - - 50,000
CROSS COUNTY CONNECTOR TRAIL PHASE II - - - 50,000 - - 50,000
CROSS COUNTY CONNECTOR TRAIL PHASE III - - - - 50,000 - 50,000
SUDLERSVILLE PARK - IRRIGATION - - 100,000 - - - 100,000
CHURCH HILL PARK IMPROVEMENTS - 100,000 - - - - 100,000
WHITE MARSH PARK - LIGHTING - - 450,000 450,000 - - 900,000
LAND- STREAM VALLEY - - - 200,000 - - 200,000
TOTAL PARKS 600,000 875,000 1,120,000 1,320,000 550,000 850,000 5,315,000
TOTAL GENERAL CAPITAL PROJECTS 35,049,910 27,795,830 40,889,800 5,436,786 14,704,680 3,344,963 127,221,969
CAPITAL EQUIPMENT - LANDINGS 1 0,000 5,000 15,000 15,000 - - 45,000
CORSICA RIVER DREDGING - 300,000 - - - - 300,000
DOMINION PARKING LOT PAVING - - - - - 49,000 49,000
GOODHAND'S CREEK PARKING PAVING - - - 49,000 - - 49,000
MATAPEAKE PIER PARKING LOT - 125,000 - - - - 125,000
KENT NARROWS RAMP PARKING PAVING - - 49,000 - - - 49,000
PAY MACHINES FOR ROMANCOKE AND MATAPEAKE - 50,000 - - - - 50,000
DEEP CREEK LANDING BULKHEAD - - - - 150,000 - 150,000
PUBLIC LANDINGS LAND - UNDESIGNATED - 10,000 10,000 10,000 1 0,000 10,000 50,000
CRUMPTON BULKHEAD 100,000 - - - - - 100,000
THOMPSON CREEK BULKHEAD - - - - - 225,000 225,000
TOTAL PUBLIC LANDINGS ENTERPRISE 110,000 490,000 74,000 74,000 160,000 284,000 1,192,000
BLUE HERON GOLF COURSE - IRRIGATION 270,000 - - - - - 270,000
BLUE HERON DRIVING RANGE 50,000 - - - - - 50,000
TOTAL GOLF COURSE ENTERPRISE 320,000 - - - - - 320,000
RELOCATE PIER ONE ROAD 1,000,000 1,000,000 - - - - 2,000,000
ADDITIONAL HANGERS 750,000 - - - - - 750,000
REHAB RUNWAY CONSTRUCTION - - 2,600,000 2,600,000 - - 5,200,000
RUNWAY REHAB DESIGN - 300,000 - - - - 300,000
CONSTRUCT APRON PHASE II 2,000,000 - - - - - 2,000,000
TOTAL BAY BRIDGE AIRPORT ENTERPRISE 3,750,000 1,300,000 2,600,000 2,600,000 - - 10,250,000
HOUSING REHABILITATION LOANS 50,000 50,000 50,000 50,000 5 0,000 50,000 300,000
QACCA OUR HAVEN SHELTER 1,450,958 - - - - - 1,450,958
TOTAL HOUSING AND COMMUNITY SERVICES 1,500,958 50,000 50,000 50,000 50,000 50,000 1,750,958
CAPITAL EQUIPMENT - LIGHT VEHICLES 210,000 210,000 180,000 120,000 120,000 120,000 960,000
CAPITAL EQUIPMENT - HEAVY & CONSTRUCTION VEHICLES 8 0,000 620,000 455,000 705,000 455,000 360,000 2 ,675,000
CAPITAL EQUIPMENT - MISC SMALL & NON-MOTORIZED EQUIP 6 0,000 60,000 60,000 60,000 6 0,000 60,000 360,000
ASPHALT OVERLAYS 250,000 250,000 250,000 250,000 250,000 250,000 1 ,500,000
TAYLOR MILL ROAD BRIDGE - - - - - 1,000,000 1,000,000
TOTAL ROADS BOARD CAPITAL PROJECTS 600,000 1,140,000 945,000 1,135,000 885,000 1,790,000 6,495,000
DISCHARGE PUMP REPLACEMENTS - 50,000 - 50,000 - 50,000 150,000
VACUUM PUMP REPLACEMENTS 6 0,000 - 60,000 - 60,000 - 180,000
PICKUP TRUCK - REPLACEMENT 125,000 - - 150,000 - - 275,000
CONSTRUCTION EQUIPMENT-SEWER 100,000 - - - - - 100,000
COUNTY WIDE ORTHO/PLANIMETRIC MAPPING 1 5,000 5,000 5,000 5,000 5,000 15,000 50,000
RT18 & RT552 FORCE MAIN REPLACE - PH I 290,000 260,000 - - - - 550,000
COLLECTION STATION 'J' FORCE MAIN - 75,000 - - - - 75,000
GENERATOR REPLACEMENTS 288,769 - - - - - 288,769
SEWER COLLECTION STATION "M" - - - - - 200,000 200,000
VACUUM MAIN K-I REPLACEMENT - HESS ROAD - - 100,000 - - - 100,000
TOTAL SEWER ENTERPRISE 878,769 390,000 165,000 205,000 65,000 265,000 1,968,769
KENT NARROWS TOWER & DISTRIBUTION - - - - - 750,000 750,000
COUNTY WIDE ORTHO/PLANIMETRIC MAPPING 1 5,000 5,000 5,000 5,000 5,000 15,000 50,000
MISCELLANEOUS SMALL EQUIPMENT-WATER 1 7,500 - - 25,000 - - 42,500
LOWER PATAPSCO WELLS - - - - - 100,000 100,000
STEVENSVILLE WTP UPGRADE - 300,000 - 250,000 250,000 - 800,000
GRASONVILLE WTP UPGRADE - - 250,000 - 350,000 - 600,000
HEAVY TRUCK - REPLACEMENT - - 100,000 - - - 100,000
GRASONVILLE TO KENT NARROWS MAIN - - - - - 800,000 800,000
PICKUP TRUCK FLEET - REPLACEMENT 5 5,000 - - 60,000 - - 115,000
GAS DISINFECTION ELIMINATION PROJECT 3 0,000 - - - - - 30,000
WATER - GENERATORS 118,938 - 75,000 - - - 193,938
WATER - FOUR SEASONS 750 gpm WTP EXPANSION - - - - - 2,500,000 2,500,000
TOTAL WATER ENTERPRISE 236,438 305,000 430,000 340,000 605,000 4,165,000 6,081,438
TOTAL ALL CAPITAL PROJECTS 42,446,075 31,470,830 45,153,800 9,840,786 16,469,680 9,898,963 155,280,134
21
An unhandled error has occurred. Reload 🗙

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.